Tricon FRP Pipe System

 

APPLICATION:
Chilled Water, Condensate, Domestic Water, Heating Hot Water, Petroleum Products, Potable Water

SERVICE PIPE:
Filament Wound Fiberglass with epoxy resins

INSULATION:
Polyurethane Foam

TEMP:
Up to 225°F (107°C)

NOM LENGTH:
20 Ft. - 40 Ft.

Service Pipe:

The service pipe can be filament wound fiberglass-reinforced epoxy, bell and spigot, designed to withstand up to 250°F. Pipe sizes 2” through 8” may be supplied in 20 Ft. random lengths. Pipe sizes 10” through 16” to be supplied in 40 Ft. lengths. Straight lengths of piping will be supplied with 6” of piping exposed at each end for field joint fabrication.

Insulation:

The insulation shall be a foamed in place closed cell polyurethane which completely fills the annular space between the carrier pipe and the exterior casing. The insulation shall have the following physical properties:
  • Minimum Density (lb./cu. ft.) 2.0 ASTM D-1621
  • 90-95 % Closed Cell ASTM D-2856
  • “K” Factor BTU/Hr. sq. ft. °F/in. 147 ASTM C-177

Exterior Casing:*

The exterior casing shall be
(1) Seamless, extruded white PVC Type 1, Grade 1 Class 12454-B per ASTM D-1784 or
(2) High Density Polyethylene (H.D.P.E.) ASTM D-1248 with the following physical properties:
  • ASTM D-3350…Resin Type III, Grade P34
  • ASTM D-638…Ultimate Elongation 850%
  • ASTM D-638…Tensile Yield Strength 3300 psi
  • ASTM D-790…Tangent Flexural Modules 175,000 psi

No polyethylene tape casings will be allowed.

Sub-Assemblies:

Any requirement for thrust blocking is the responsibility of the design engineer. Fittings that do not require restraint blocks should be field insulated. Fittings that require restraint blocks must have blocks designed by the design engineer. FRP pipe should be joined to steel systems with flanges. All steel systems should be anchored within five feet of connection point to eliminate any thrust, stress, or torque from being transferred to the FRP from the steel.

Field Joints:

After welding and hydrostatic testing, PVC jacketed straight field joints shall be insulated with polyurethane foam to the thickness specified, PVC sleeve and pressure sensitive tape. HDPE jackets will use polyurethane foam and a heat shrinkable sleeve.

Installation:

No Piping shall be installed in standing water. Trenches shall be maintained dry until final field closure is complete. The installing contractor shall handle the piping system in accordance with the directions furnished by the manufacturer and as approved by the architect and engineer. The carrier piping shall be hydrostatically tested as specified in the contract documents. EXERCISE DUE CARE WHEN INSTALLING AND TESTING THE PIPING SYSTEM. DO NOT TEST WITH AIR OR GAS.

Backfill:

A 4-inch layer of sand or fine gravel shall be placed and tamped in the trench to provide stable and uniform bedding for the TRICON FRP system. Once the system is in place, the trenches shall be carefully backfilled with similar material and hand tamped in 6” layers until a minimum of 12” above the top of the preinsulated pipe has been achieved. The remainder of the backfill shall be void of rocks, frozen earth and foreign material. The trench shall be compacted to comply with H-20 Highway loading.

For other relevant searches, you might want to try:

(21 11 00) Facility Fire-Suppression Water-Service Piping
(21 21 13) Carbon-Dioxide Fire-Extinguishing Piping
(21 22 13) Clean-Agent Fire-Extinguishing Piping
(21 23 13) Wet-Chemical Fire-Extinguishing Piping
(21 24 13) Dry-Chemical Fire-Extinguishing Piping
(22 10 00) Plumbing Piping
(22 11 13) Facility Water Distribution Piping
(22 11 16) Domestic Water Piping
(22 11 19) Domestic Water Piping Specialties
(22 13 16) Sanitary Waste and Vent Piping
(22 13 19) Sanitary Waste Piping Specialties
(22 14 13) Facility Storm Drainage Piping
(22 14 19) Sump Pump Discharge Piping
(22 14 23) Storm Drainage Piping Specialties
(22 51 13) Swimming Pool Piping
(22 52 13) Fountain Piping
(22 66 53) Laboratory Chemical-Waste and Vent Piping
(22 66 70) Healthcare Chemical-Waste and Vent Piping
(23 11 00) Facility Fuel Piping
(23 11 13) Facility Fuel-Oil Piping
(23 11 16) Facility Gasoline Piping
(23 11 23) Facility Natural-Gas Piping
(23 11 26) Facility Liquefied-Petroleum Gas Piping
(23 20 00) HVAC Piping and Pumps
(23 21 00) Hydronic Piping and Pumps
(23 21 13) Hydronic Piping
(23 21 16) Hydronic Piping Specialties
(23 22 00) Steam and Condensate Piping and Pumps
(23 22 13) Steam and Condensate Heating Piping
(23 22 16) Steam and Condensate Heating Piping Specialties
(23 23 00) Refrigerant Piping
(23 24 00) Internal-Combustion Engine Piping
(33 11 00) Water Utility Distribution Piping
(33 11 13) Public Water Utility Distribution Piping
(33 11 16) Site Water Utility Distribution Piping
(33 11 19) Fire Suppression Utility Water Distribution Piping
(33 31 00) Sanitary Utility Sewerage Piping
(33 31 13) Public Sanitary Utility Sewerage Piping
(33 31 16) Industrial Waste Utility Sewerage Piping
(33 41 00) Storm Utility Drainage Piping
(33 41 13) Public Storm Utility Drainage Piping
  (33 46 16) Subdrainage Piping
(33 51 13) Natural-Gas Piping
(33 63 13) Underground Steam and Condensate Distribution Piping
(33 63 23) Aboveground Steam and Condensate Distribution Piping
(40 10 00) Gas and Vapor Process Piping
(40 11 00) Steam Process Piping
(40 11 13) Low-Pressure Steam Process Piping
(40 11 16) Intermediate-Pressure Steam Process Piping
(40 11 19) High-Pressure Steam Process Piping
(40 11 23) Condensate Process Piping
(40 12 00) Compressed Air Process Piping
(40 13 00) Inert Gases Process Piping
(40 13 13) Argon Process Piping
(40 13 16) Carbon-Dioxide Process Piping
(40 13 19) Helium Process Piping
(40 13 23) Krypton Process Piping
(40 13 26) Neon Process Piping
(40 13 29) Nitrogen Process Piping
(40 13 33) Xenon Process Piping
(40 13 93) Mixed Inert Gases Process Piping
(40 14 00) Fuel Gases Process Piping
(40 14 13) Blast Furnace Piping
(40 14 16) Blue (Water) Fuel Gas Piping
(40 14 19) Butane Piping
(40 14 23) Carbon-Monoxide Piping
(40 14 26) Chlorine Fuel Gas Piping
(40 14 29) Coke Oven Gas Piping
(40 14 33) Ethane-Gas Piping
(40 14 36) Hydrogen Fuel Gas Piping
(40 14 39) Liquid Natural-Gas Process Piping
(40 15 00) Combustion System Gas Piping
(40 16 00) Specialty and High-Purity Gases Piping
(40 17 00) Welding and Cutting Gases Piping
(40 18 00) Vacuum Systems Process Piping
(40 20 00) Liquids Process Piping
(40 21 00) Liquid Fuel Process Piping
(40 22 00) Petroleum Products Piping
(40 23 00) Water Process Piping
(40 24 00) Specialty Liquid Chemicals Piping
(40 25 00) Liquid Acids and Bases Piping
(40 26 00) Liquid Polymer Piping