GeneralThis specification is for use over any type of approved, lightweight,
insulating concrete fill deck (without insulation) which can receive and adequately retain nails or other types of mechanical fasteners as may be recommended by the deck manufacturer. Examples of such decks are Zonolite, Celcore and Elastizell. JM Ventsulation Felt is recommended over any wet fill deck and may be required as a condition of guarantee.* In Region 1, contact a JM Technical Services Specialist for written approval when using this specification over lightweight insulating concrete or fill material.
Design and installation of the deck and/or substrate must result in the
roof draining freely and to outlets numerous enough and so located as to remove water promptly and completely. Areas where water ponds for more than 24 hours are unacceptable and are not eligible to receive a JM Roofing Systems Guarantee.Note: All general instructions contained in the current JM Commercial/Industrial Roofing Systems Manual should be considered part of this
specification. FlashingsFlashing details can be found in the "Bituminous Flashings" section of the
JM Commercial/Industrial Roofing Systems Manual. ApplicationNote: On roof decks with slopes up to 1" per foot (83.3 mm/m), the roofing
felts may be installed either perpendicular or parallel to the roof incline. On slopes over 1" per foot (83.3 mm/m), refer to Paragraph 6.11 of this section for special requirements.Using GlasBase, GlasBase Plus, PermaPly 28 or Ventsulation, start with
an 18" (457 mm) width (the use of a specific base sheet may be a condition of Guarantee). The following base sheet courses are to be applied full width, lapping the preceding felt 2" (51 mm) on the side laps and 4" (102 mm) on the end laps. Nail the side laps 9" (229 mm) o.c. Down the longitudinal center of each felt, place two rows of nails spacedapproximately 11" (279 mm) apart, with the nails staggered on approximately
18" (457 mm) centers. Use nails or fasteners appropriate to the type of deck with 1" (25 mm) minimum diameter caps. Consult the current Factory Mutual Approval Guide for the appropriate base sheet, fastener type and pattern. For additional fastener information, refer to the Fastener Data in the "Roof Deck" section of the current JM Commercial/Industrial Roofing Systems Manual.Using GlasPly Premier or GlasPly IV, apply a piece 12" (305 mm) wide, then
over that, one 24" (610 mm) wide, then over both, a full width piece. The following felts are to be applied full width, overlapping the preceding felts by 24 2/3" (627 mm) so that at least 3 plies of felt cover the base felt/substrate at all locations. Install each felt so that it is firmly and uniformly set, without voids, into the hot asphalt (within �25�F [�14�C] of the EVT) applied just before the felt at a nominal rate of 23 lbs. per square (1.1 kg/m2) over the entire surface. SurfacingFlood the surface with the appropriate asphalt at an approximate rate of
60 lbs. per square (2.9 kg/m2). Into the hot asphalt, embed an acceptable gravel at a rate of 400 lbs. per square (19.5 kg/m2) or an acceptable slag at a rate of 300 lbs. per square (14.6 kg/m2). Aggregate must be installed so that there is complete coverage across the entire surface and at least 50% of the aggregate is solidly adhered in the hot asphalt. Aggregate should meet the requirements of ASTM D 1863. AsphaltAsphalt should meet the requirements of ASTM D 312.
JM Guarantees require the use of Trumbull asphalt or another JM
Approved Asphalt. The Contractor must provide an Asphalt Confirmation Number (ACN) on projects which require a JM Guarantee. The ACN will indicate that the asphalt was registered with the approved asphalt source.Check with a JM Technical Services Specialist for special asphalt
requirements in hot climates.
For identical copy of this specification, ask for RS-2041.