jmlogo.jpg (11366 bytes) Built-Up Roofing Specifications

Specification 4GIS

Four Ply Smooth Surfaced Fiber Glass Built-Up Roof. For use over JM insulation, approved decks or other approved insulations, on inclines of up to 6" per foot (500 mm/m).

For Regions 1, 2 and 3

sec06k1.gif (43315 bytes)

General

This specification is for use over any type of approved structural deck which is not nailable and which offers a suitable surface to receive the roof. Poured and pre-cast concrete decks require priming with JM Concrete Primer prior to application of hot asphalt.

This specification is also for use over JM roof insulations or other approved rigid roof insulations, which are not nailable and which offer a suitable surface to install the roof. Specific written approval is required for any roof insulation not manufactured or supplied by JM. Insulation should be installed in accordance with the appropriate JM Insulation Specification detailed in the current JM Commercial/Industrial Roofing Systems Manual. This specification can also be used in certain reroofing situations. Refer to the "Reroofing" section of the JM Commercial/ Industrial Roofing Systems Manual. This specification is not to be used directly over poured or pre-cast gypsum or lightweight, insulating concrete fills.

Design and installation of the deck and/or substrate must result in the roof draining freely and to outlets numerous enough and so located as to remove water promptly and completely. Areas where water ponds for more than 24 hours are unacceptable and are not eligible to receive a JM Roofing Systems Guarantee.

Note: All general instructions contained in the current JM Commercial/ Industrial Roofing Systems Manual should be considered part of this specification.

Flashings

Flashing details can be found in the "Bituminous Flashings" section of the JM Commercial/Industrial Roofing Systems Manual.

sec06k2.gif (20989 bytes)

Application

Note: On roof decks with slopes up to 2" per foot (166.6 mm/m), the roofing felts may be installed either perpendicular or parallel to the roof incline. On slopes over 2" per foot (166.6 mm/m), refer to Paragraph 6.11 of this section for special requirements.

Using GlasPly Premier or GlasPly IV, apply a piece 9" (229 mm) wide, then over that, one 18" (457 mm) wide, then over that, one 27" (686 mm) wide. Over these 3 partial sheets, install a full width 36" (914 mm) piece. The following felts are to be applied full width, overlapping the preceding felts by 27 " (699 mm) so that at least 4 plies of felt cover the substrate at all locations. Install each felt so that it is firmly and uniformly set, without voids, into the hot asphalt (within �25�F [�14�C] of the EVT) applied just before the felt at a nominal rate of 23 lbs. per square (1.1 kg/m2), over the entire surface. Installation over porous substrates such as roof insulation may require up to 33 lbs. of hot asphalt per square (1.6 kg/m2).

Surfacing

Finish the entire membrane surface with a uniform application of the selected coating. Refer to Paragraph 6.9.3 of this section for more specific information regarding the particular coating. Pay particular attention to the installation directions printed on the label of the container for the chosen coating.

Asphalt

Asphalt should meet the requirements of ASTM D 312. JM Guarantees require the use of Trumbull asphalt or another JM Approved Asphalt. The Contractor must provide an Asphalt Confirmation Number (ACN) on projects which require a JM Guarantee. The ACN willindicate that the asphalt was registered with the approved asphalt source.

Check with a JM Technical Services Specialist for special asphalt requirements in hot climates.

 

For an identical copy of this specification, ask for RS-2030.