Two Piece Roman Clay. CSI 3-Part Specifications.
TECHNICAL INFORMATION
SECTION 07320
TWO-PIECE ROMAN CLAY ROOFING TILE
PART 1 GENERAL
10.01 SECTION INCLUDES
A. Formed clay roofing tiles, complete with components and other required accessories as needed for a complete and proper installation.
B. Underlayment, eave, valley, rake, and ridge protection; nailers, sheet metal flashings and tile fastening.
1.02 REFERENCES
A. ICBO Report No. 4300 - Clay Roofing Tiles.
B. ASTM Standard Specifications
1.03 SUBMITTALS
A. Submit under provisions of Section 01300.
B. Shop Drawings: Submit Shop Drawings showing details on hip, ridge, valley and rake configurations, methods of fastening, and collaborated details of related work.
C. Product Data: Submit manufacturer's data on tile properties, configurations and colors.
D. Samples: Submit two tile Samples illustrating color, surface finish and texture, and tile configuration for Architect's approval.
1.04 QUALITY ASSURANCE
A. Use adequate number of skilled workmen who are thoroughly skilled and experienced in the necessary crafts and who are completely familiar with the specified requirements and methods needed for proper performance of the Work of this Section
1.05 DELIVERY, STORAGE, AND HANDLING
A. All material shall be handled and stored in a manner which will prevent its damage.
B. Materials shall be stored in original containers and shall be clearly marked with the manufacturer's name.
PART 2 PRODUCTS
2.01 CLAY ROOFING TILE
A. Where indicated on the Drawings, provide Two-Piece Roman Clay Roofing Tile as manufactured by Redland Clay Tile Inc., 1287 Linda Vista Drive, San Marcos, CA 92069 (800) 354-5983, in color "_______" with matching birdstops at all eaves.
2.02 OTHER MATERIALS
A. Underlayment:
1. Underlayment shall conform to one of the following:
B. Nailers:
1. Where indicated on the Drawings or where required for proper fastening, provide:
C. Flashing:
D. Fasteners:
E. Mortar materials, plastic cement and sealant:
PART 3 EXECUTION
3.01 EXAMINATION AND PREPARATION
A. Verify that deck surfaces are clean, dry, free of ridges, warps or voids.
B. Verify roof openings are correctly framed prior to installing work of this Section. Do not proceed until all unsatisfactory conditions have been corrected.
3.02 INSTALLATION
A. Underlayment:
B. Flashing:
1. Flash at valleys in strict accordance with Chapter 15 of the Uniform Building Code:
2. At sides of dormers, chimneys and other walls, extend flashing at least 6 inches up vertical surface.
3. At lower sides of dormers, chimneys and other walls, extending flashing at least 3 inches up wall and 4 inches over tile, and then thoroughly counterflash.
4. At wood saddles and returns, line with 16 oz. copper extending up roof slope not less than 12 inches, and up vertical walls not less than 6 inches, and thoroughly counterflash.
5. Make all counterflashing plugged, pointed and secure.
6. Extend metal gutter up roof to a point higher than the outer edge of gutter.
C. Birdstops, boosters and starters:
NOTE TO SPECIFIER
: Select one****OR****
****OR****
D. Fasteners: (Edit to avoid conflicting requirements)
E. Install field tile in courses beginning at eave working up incline of roof deck.
NOTE TO SPECIFIER
: Select one:4. All tile in contact with cement mortar shall be immersed in water for two minutes before laying.
5. To avoid color problems on roof:
6. Correct and color or installation problems before proceeding with the installation.
7. Complete installation to provide weather tight service.
****OR****
1. Install pan tiles in vertical rows at a maximum of 13 inch centers, with Baja Mission cover tiles fastened over the intervening spaces, providing a maximum exposure of 14-1/2 inches for each tile.
2. As an alternate, end laps of cover tile can be embedded in cement mortar for a more rustic appearance.
3. Install hip, ridge and rake tiles:
4. All tile in contact with cement mortar shall be immersed in water for two minutes before laying.
5. To avoid color problems on roof:
6. Correct any color or installation problems before proceeding with the installation.
7. Complete installation to provide weather tight service.
****OR****
1. Install pan tiles in vertical rows at a maximum of 13 inch centers, with Euro Baja Mission cover tiles fastened over the intervening spaces, providing a maximum exposure of 14-1/2 inches for each tile.
2. As an alternate, end laps of cover tile can be embedded in cement mortar for a more rustic appearance.
3. Install hip, ridge and rake tiles:
a. Provide cement mortar at all hips, ridges and rakes to completely fill voids and to weatherproof the roof.
b. All hip, ridge, rake and first row of cover tiles after gable roll shall be set in cement mortar and fastened by non-corrosive nails.
4. All tile in contact with cement mortar shall be immersed in water for two minutes before laying.
5. To avoid color problems on roof:
a. Roof load tiles from different pallets.
b. Visually inspect application from the ground level after installing 100 tiles.
c. Visually verify that roof tile color is uniform and even, and verify that tile courses are straight and true.
6. Correct any color or installation problems before proceeding with the installation.
7. Complete installation to provide weather tight service.
3.03 CLEAN UP
A. Clean roof to remove all piece of debris.
B. Remove and dispose of all work-related refuse and debris.
END OF SECTION